High-Attention BOM Parts

Samtec SS5, ST5 and ASP Connector RFQ Checklist

Samtec connector sourcing checklist for SS5-50-350-X-D-K, ST5-50-1.50-L-D-P-TR, ASP-134486-01 and high-speed board BOMs.

Guide

Practical Procurement Notes

Why this BOM line gets buyer attention

Samtec board-to-board and mezzanine connector lines can slow a BOM when pitch, stack height, plating, orientation or mating-part detail is missing from the RFQ.

A high-attention part number should still be handled as an RFQ line, not as a public stock claim. Buyers should confirm the exact orderable code, supplier evidence, package condition and realistic delivery timing before comparing offers.

Typical project context

  • high-speed board-to-board interconnect
  • FPGA carrier boards
  • instrument modules
  • prototype and small-batch builds

RFQ checks before comparing offers

1Exact Samtec series and suffix
2Pitch, stack height and row count
3Plating and orientation
4Mating connector confirmation
5Packing format
6Lead time for prototype and production quantities

Common buyer mistakes

MistakeWhy it mattersBetter RFQ note
Sending only the connector seriesStack height or mating side can be wrongSend the complete orderable code
Ignoring the mating halfOne connector line may not solve the BOMQuote mating connectors together
Treating custom ASP numbers as genericCustom or configured codes need confirmationAsk supplier to verify the exact ASP code

Related part pages

SS5-50-350-X-D-K, ST5-50-1.50-L-D-P-TR, ASP-134486-01 and ASP-134603-01 are useful starting points for RFQ preparation. Connector RFQs should include mechanical details and mating-part context to reduce mismatch risk.

Availability and evidence note

Availability can change quickly for high-attention BOM lines. Ask for supplier source review, packaging condition, date-code details and available documentation before purchase approval.

What to send before quotation

  • Full orderable part number and manufacturer preference
  • Target quantity and delivery destination
  • Package, suffix, temperature grade and date-code requirement
  • Approved alternates or parts that must not be substituted
  • BOM file, photos or previous supplier documents when available

SDAK sourcing workflow

Step 1

Review the part number and package suffix

Step 2

Check realistic lead time and date-code expectations

Step 3

Screen supplier channel and documentation

Step 4

Return quote feedback with risk notes

Need sourcing support?

Send us your part number, target quantity, package requirement and delivery schedule. Our team will review the RFQ and respond with sourcing options.

Request Quote

Send Your RFQ or BOM List

Our team will review part numbers, quantity, lead time and sourcing risk before replying.

Excel, CSV or PDF (Max 20MB)

Contact Information

Response Time

Usually within 24 hours

Work Time

Monday-Friday 09:00-18:00 (UTC+8)

Location

Xi'an, Shaanxi, China

Chat Now