High-Attention BOM Parts

Amphenol and TE Connectivity Connector BOM RFQ Notes

Connector sourcing notes for Amphenol 10144517, 10144518, U77-A1114-100T and TE Connectivity 1367073-1 BOM lines.

Guide

Practical Procurement Notes

Why this BOM line gets buyer attention

Amphenol and TE Connectivity connector lines often need more than a part number because cable side, board side, plating, orientation and project approval requirements can change the quote.

A high-attention part number should still be handled as an RFQ line, not as a public stock claim. Buyers should confirm the exact orderable code, supplier evidence, package condition and realistic delivery timing before comparing offers.

Typical project context

  • board connectors and cable interfaces
  • industrial equipment maintenance
  • high-speed I/O assemblies
  • BOM cleanup before RFQ

RFQ checks before comparing offers

1Manufacturer and series confirmation
2Mating-part and cable-side review
3Orientation and plating
4Lead-free suffix or lifecycle status
5Packing and quantity split
6Mechanical drawing or previous PO reference

Common buyer mistakes

MistakeWhy it mattersBetter RFQ note
Quoting connectors without drawingsMechanical variants can be confusedAttach drawings or previous approved BOM notes
Ignoring mating partsThe assembly may still be blockedReview both sides of the connector pair
Assuming all LF suffixes mean the same thingOrderable suffix and lifecycle may differKeep suffix and manufacturer reference in the RFQ

Related part pages

10144517-061802LF, 10144518-062802LF, U77-A1114-100T and 1367073-1 are useful starting points for RFQ preparation. Connector sourcing is most reliable when the RFQ includes mechanical context and approved manufacturer preference.

Availability and evidence note

Availability can change quickly for high-attention BOM lines. Ask for supplier source review, packaging condition, date-code details and available documentation before purchase approval.

What to send before quotation

  • Full orderable part number and manufacturer preference
  • Target quantity and delivery destination
  • Package, suffix, temperature grade and date-code requirement
  • Approved alternates or parts that must not be substituted
  • BOM file, photos or previous supplier documents when available

SDAK sourcing workflow

Step 1

Review the part number and package suffix

Step 2

Check realistic lead time and date-code expectations

Step 3

Screen supplier channel and documentation

Step 4

Return quote feedback with risk notes

Need sourcing support?

Send us your part number, target quantity, package requirement and delivery schedule. Our team will review the RFQ and respond with sourcing options.

Request Quote

Send Your RFQ or BOM List

Our team will review part numbers, quantity, lead time and sourcing risk before replying.

Excel, CSV or PDF (Max 20MB)

Contact Information

Response Time

Usually within 24 hours

Work Time

Monday-Friday 09:00-18:00 (UTC+8)

Location

Xi'an, Shaanxi, China

Chat Now