Why this BOM line gets buyer attention
Amphenol and TE Connectivity connector lines often need more than a part number because cable side, board side, plating, orientation and project approval requirements can change the quote.
A high-attention part number should still be handled as an RFQ line, not as a public stock claim. Buyers should confirm the exact orderable code, supplier evidence, package condition and realistic delivery timing before comparing offers.
Typical project context
- board connectors and cable interfaces
- industrial equipment maintenance
- high-speed I/O assemblies
- BOM cleanup before RFQ
RFQ checks before comparing offers
Common buyer mistakes
| Mistake | Why it matters | Better RFQ note |
|---|---|---|
| Quoting connectors without drawings | Mechanical variants can be confused | Attach drawings or previous approved BOM notes |
| Ignoring mating parts | The assembly may still be blocked | Review both sides of the connector pair |
| Assuming all LF suffixes mean the same thing | Orderable suffix and lifecycle may differ | Keep suffix and manufacturer reference in the RFQ |
Related part pages
10144517-061802LF, 10144518-062802LF, U77-A1114-100T and 1367073-1 are useful starting points for RFQ preparation. Connector sourcing is most reliable when the RFQ includes mechanical context and approved manufacturer preference.
Availability and evidence note
Availability can change quickly for high-attention BOM lines. Ask for supplier source review, packaging condition, date-code details and available documentation before purchase approval.
What to send before quotation
- Full orderable part number and manufacturer preference
- Target quantity and delivery destination
- Package, suffix, temperature grade and date-code requirement
- Approved alternates or parts that must not be substituted
- BOM file, photos or previous supplier documents when available
SDAK sourcing workflow
Step 1
Review the part number and package suffix
Step 2
Check realistic lead time and date-code expectations
Step 3
Screen supplier channel and documentation
Step 4
Return quote feedback with risk notes
Need sourcing support?
Send us your part number, target quantity, package requirement and delivery schedule. Our team will review the RFQ and respond with sourcing options.
